Sheerness Linkspan
In 2013 we inspected the Ro-Ro linkspan at Berth 4 in the Port of Sheerness and identified a number of major defects. We then carried out..
In 2013 we inspected the Ro-Ro linkspan at Berth 4 in the Port of Sheerness and identified a number of major defects. We then carried out..
The former Shell Oil terminal in the lower reaches of the Thames Estuary is to be redeveloped as a deep water port. Its close proximity..
A new LNG import terminal is being planned for construction at Milford Haven at the site of the former Exxon Mobil Oil refinery in this..
A study was required by the client to review initial proposals and make plans for construction of a new container terminal. The exact..
CSXWT was part owner and operator of this new container terminal in the Dominican Republic, with Bouygues as the construction manager...
The Thames-side barge wharf at Rainham had been constructed following the Second World War using some of the floating roadway units that..
A jetty has been constructed for handling 30,000DWT dry bulk carriers with an approach extending more than 2 kilometres out into the Gulf..