Barrow WoDS Crew Transfer
A new berthing facility was needed by the client for the transfer of crew to their offshore Windfarm facility. Beckett Rankine was asked..
A new berthing facility was needed by the client for the transfer of crew to their offshore Windfarm facility. Beckett Rankine was asked..
Because of the dramatic rise in the export of LNG and other gas products from Qatar, a major development of Ras Laffan LNG port was..
Located on the estuary of the River Medway in Kent, Berth No 4 in Sheerness Docks is used by quarter ramp RoRo vessels transporting cars,..
In order to secure a constant and diverse source of gas supply to the UK, a new Liquefied Natural Gas (LNG) import terminal is required..
A new berthing facility to transfer crew from the Barrow Offshore Windfarm was needed. The brief was a difficult one as the new pontoon..
The Yamal Peninsula houses an enormous quantity of natural gas, which is considered to be the fuel of the future. However, the..
The Port of Tanjung Pelapas was conceived as part of Malaysia’s 2020 plan and the project was designed and constructed within three years..
The NLE timber terminal at the Port of Novorossiysk on the Black Sea needed to be expanded to accommodate sustained export of sawn..
Dredging International and CTOW had been asked to provide engineering, procurement and construction for the installation of a temporary..