Year
2007
Project Type
Oil and LNG
Location
UK

A new LNG import terminal is being planned for construction at Milford Haven at the site of the former Exxon Mobil Oil refinery in this naturally protected harbour in South Wales. This terminal is likely to receive over 15 million tons of liquefied gas per annum to boost UK’s depleted gas supply from the North Sea.

Beckett Rankine carried out a peer review of the front-end engineering design of the marine civil engineering aspects. An auditable question and answer format was used with a dialogue between designers and client so that critical issues could be agreed for the final deliverables.