The first THORP Evaporator D modules arrive at Sellafield
The first two modules for the Evaporator D project have been delivered to Sellafield beach, click here for a video of the beach landing..
The first two modules for the Evaporator D project have been delivered to Sellafield beach, click here for a video of the beach landing..
There was great excitement in Alderney on Monday when the 90m long cruise ship ‘Island Sky’ berthed alongside the new Commercial Quay...
Work is under way on constructing London’s latest passenger pier at St George’s Wharf in Vauxhall. In the photo the contractor, Red 7..
Yesterday (27 January) London Borough of Greenwich’s Planning Board unanimously voted to grant planning consent for West Properties’..
On 23 November Imperial Wharf Marina (IWM) celebrated the arrival of the first customer’s boat with a press day. IWM at Chelsea is the..
Beckett Rankine have been appointed to design the marine base at Ramsgate Harbour for servicing the London Array. The London Array is..
Beckett Rankine have been appointed to assist with the design of the ship impact protection system for the south tower of TfL’s London..
Construction of Imperial Wharf Marina on the river Thames has commenced with the installation of piles for the bankseat. The main..
The latest Dockmaster pontoon has been installed for Dong Energy to serve their Barrow Offshore Windfarm (BOWind) project. We have..